The Murrumburrah Flood Study (Reference 1), the first stage of the management process was completed in December 2019. The Murrumburrah Floodplain Risk Management Study and Plan...
-
Volume 1 and Volume 2
-
Draft Report (Volume 1 and Volume 2)
-
Volume 1 and Volume 2
-
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study...
-
Volume 1- Preliminary Draft Report Volume 2- Figures
-
The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...