-
Hydraulic Model Input and Output Data
- ZIP
-
DRAINS
- ZIP
-
DRAINS and RAFTS
- ZIP
-
TUFLOW
- ZIP
-
TUFLOW
- ZIP
-
Post-processed, range of durations (5y ARI to PMF)
- ZIP
-
Interim. Includes blockage.
- ZIP
-
Flood fringe and flood way for high hazard and low hazard.
- ZIP
-
Rainfall, roughness, blockage (partial)
- ZIP
-
GIS Layers.
- ZIP