-
Oyster aquaculture areas are areas of NSW estuaries assessed for edible oyster aquaculture. These areas were categorised by assessment of all current, former and potential...
- SEED Web Map
- XML
- WMS
- ARCGIS REST SERVICE
View Dataset 1 citation -
A total of 25 unique feature types were captured across the lower Mehi River system via on-screen mapping in February 2022. These features include channel beds, forested and...
- ZIP
View Dataset 1 citation -
This time series hydrologic modelling was done at the direction of the Connectivity Expert Panel. The panel used the modelling data to inform the proposed protection of base...
- XLS
-
The Department of Planning provides support to Local Government to enable evidence-based planning decisions. Biodiversity and Conservation Division collaborated with Cessnock...
- ZIP
-
The Without Development Model is a hydrological model of a river system without any representation of water infrastructure (e.g. storages, weirs), water extraction, water...
- SEED Web Map
-
The Macquarie Without Development model covers the headwater catchments and river reaches of the Macquarie River basin. This includes the Macquarie River and explicit...
- ZIP
- DOC
-
The Gwydir River 'without development' model is a hydrological model of the Gwydir River system that does not represent river system infrastructure, extractions or water...
- ZIP
-
Annual permitted take (APT) is a critical component of sustainable resource management, balancing the need for water resource utilisation with the preservation of ecosystems. It...
- ZIP
- ARCGIS REST SERVICE
-
Long-term average annual extraction limit (LTAAEL) is a regulatory limit set on annual water extractions from a river system. It ensures that average extractions over the long...
- ZIP
- ARCGIS REST SERVICE
-
Annual permitted take (APT) is a critical component of sustainable resource management, balancing the need for water resource utilisation with the preservation of ecosystems. It...
- ZIP
- ARCGIS REST SERVICE