-
GIS Outputs post processed from hydraulic modelling including: Inundation duration maps Flood zone and 1% AEP flood extent Flood mitigation option WL difference grids
- ZIP
-
Includes Flood Risk Precincts, Historic Flood Marks and Post Processed Model Outputs (Design and Historic Events). To be viewed in conjunction with the flood study report.
- ZIP
-
calculations used to determine flood damages in Ungarie
- ZIP
-
includes existing case and sensitivity runs
- ZIP
-
includes flood extents, velocity contours and depth grids for 2, 20, 100 yr ARI and PMF
- ZIP
-
TULFOW PROCESSED RESULT
- ZIP
-
Tuflow and wbnm files
- ZIP
-
TUFLOW RAW Result
- ZIP
-
Dobroyd and Hawthorne Canal Floodplain Risk Management Study and Plan Report files
- ZIP