-
The data contains: Final Floodplain Risk Management Plan report in PDF (high and low resolution) format Final Floodplain Risk Management Study report in PDF (high and low...
- ZIP
-
The Hawkesbury-Nepean River catchment is one of the largest coastal basins in NSW with an area of 21,400 square kilometres. The catchment at Penrith is 52% of the total area and...
- ZIP
-
All parts
- ZIP
-
Calibration (Historical Flood Marks and Historical Rainfall Data); Miscellaneous (Collected data, peak discharge locations, potential flood mitigation options, questionnaire...
- ZIP
-
Hydrological Model Outputs (XP-RAFTS)
- ZIP
-
Survey Information
- ZIP
-
Dataset Handover Description
- ZIP
-
Volume 1 - Main Report; Volume 2 - Figures; Volume 3 - Appendices.
-
Emergency Response Classification
- ZIP
-
Collected Data (Photos)
- ZIP